GB200 NVL72 racks, bought and hosted in India.

The first Blackwell rack-scale system: 72 GPUs on 130 TB/s of NVLink, so the whole rack works as one. GB300 NVL72 is its successor.

A dense liquid-cooled AI rack with compute trays, switch trays and coolant manifolds.
GPU memory
13.4 TB HBM3e across 72 GPUs
GPU power
About 1,200 W per GPU
Rack power
~120–132 kW per rack
Size · cooling
One full rack · Liquid

Allocation Lead time, October 2026: Longer than 8-GPU servers · All GPU lead times

Good fit for

Who buys GB200 NVL72

Precision cooling cabinets beside a row of racks.

Hosting

Where a GB200 NVL72 rack runs.

120–132 kW a rack on facility liquid cooling. We plan it with the data centre from day one.

Questions

How much power does a GB200 NVL72 rack use?

NVIDIA’s reference rack is about 120 kW; HPE publishes 132 kW nominal. It is liquid-cooled through a coolant distribution unit.

GB200 NVL72 or GB300 NVL72?

GB300 carries 20 TB of GPU memory against GB200’s 13.4 TB, with Blackwell Ultra GPUs. GB200 suits teams that can get an allocation sooner.

Is GB200 NVL72 available?

It is allocation-led; market reports showed GB200 sold out through mid-2026. See our supply desk for current status.

Owning one

Talk to OwnGPU

Give your GPUs a managed home.

One line is enough. We’ll call or email you back.

I want to

Or email [email protected] · Privacy